Run your first spares calculation

Load the built-in example, set a stock-out risk target, and see how to read the recommendation.

1 min read

On this page

Load and calculate the example

  1. Open the Stock-Out Risk calculator and choose Help → Load Example from the app menu.
  2. In Logistic Data, check that the repair delay is 30 days and the stock-out risk goal is 5%.
  3. Select Calculate Spares. The example recommends 25 spare units at an inventory cost of $52,500.

Read the recommendation

At 25 spares, the example predicts 4.81% stock-out risk, 95.19% availability and an average of 1.71 years between stock-outs. Use the chart and results table to compare nearby quantities and see what an extra spare costs.

Use your own data

Replace the example inputs with your fleet size, units per system, daily operating hours, mean time between failures (MTBF), No Fault Found (NFF) ratio, repair or replenishment delay, and unit cost. Check the glossary for definitions. Then choose a target that reflects the consequences of a shortage.

For the full workflow, follow the spares optimisation tutorial from fleet inputs through to the PDF report.