Watch the demo
1. Model one regional store
A fictional mobile network operator is upgrading its tower-mounted power amplifiers. The example treats each store as an independent stock pool. Calculate for one store first. If your stores support different fleets or have different lead times, use each store’s own data.
Choose Help → Load Example to populate the inputs below, or enter them in Logistic Data.
| Input | Value |
|---|---|
| Systems in service | 1,000 antenna towers |
| Units per system | 6 amplifiers per tower |
| Daily operating hours | 24 |
| Mean time between failures (MTBF) | 250,000 operating hours |
| No Fault Found ratio (NFF) | 5% |
| Repair delay | 30 days, including collection and return to the store |
| Unit cost | US$2,100 per amplifier |
2. Choose a service target
Pick the calculator that matches your requirement. Over the same 30-day repair period, a 99% availability goal corresponds to 1% stock-out risk and about 8.21 years between stock-outs. See how the targets convert.
For this walkthrough, select Tools → MTBSO Calculator, enter a goal of 10 years and select Calculate Spares.
3. Review the recommendation and cost
The Results Summary recommends 29 spares at US$60,900. At that stock level, the model predicts 12.45 years between stock-outs on average, 99.34% availability and 0.66% stock-out risk.
The chart plots the selected measure against the number of spares. Use the table to compare other quantities on cost and all three service measures. For example, if the requirement allows up to 5% stock-out risk over 30 days, the same inputs give a recommendation of 25 spares at US$52,500.
4. Share the results
Select Report to preview the inputs, recommendation, results table and charts. With the full app, use File → Save PDF to attach the report to a purchase proposal. Include the store, service target and turnaround assumptions so reviewers can reproduce the result.