Skip to content
Spares Calculator

Targets and results

How to convert between optimisation goals

Convert between availability, stock-out risk and mean time between stock-outs using a consistent replenishment period.

1 min read

On this page

Availability and stock-out risk

These are complementary probabilities over the same replenishment period. If both are expressed as percentages, subtract either from 100% to get the other.

Stock-out risk (%) = 100% − availability (%).

Mean time between stock-outs

Divide the replenishment delay by the risk expressed as a decimal. To reverse the conversion, divide the delay by MTBSO in the same units. Subtract that decimal from 1 to obtain availability.

MTBSO = replenishment delay ÷ stock-out probability.

Worked example

A 95% availability target over a 30-day replenishment period gives a 5% stock-out risk. Divide 30 days by 0.05 to get 600 days, or about 1.64 years. Use 1.64 years only as a rounded display value if the exact threshold matters.

Part of the Spares Calculator user guide.